A technical requirement has which of the following characteristics:
A.easy to understand
B.a communication tool between the user and the design team
C.written in non-technical language
D.developed in cooperation with the user
E.typically describe physical dimensions and performance requirements
(2013年)熵是状态参数,因此只要初终状态确定,则熵变也确定,下列中错误的是()。
A.工质循环过程∮dS=0
B.孤立系统熵变△Siso是状态参数
C.完成循环后,环境的熵变不一定为0
D.同样初终态,可逆与不可逆,工质的熵变相同
As a control tool, the bar chart (Gantt) methods is most beneficial for:
A.rearranging conflicting tasks
B.depicting actual versus planned tasks
C.showing the outer dependencies of tasks
D.A and C.
E.A and D
32 Financial compensation is the primary motivational tool for which of the following management theories of programs.
A. Zero-defects program.
B. theory X management.
C. theory Y management.
D. Quality control circles.
E. A and C
The work breakdown structure (WBS) is an excellent tool for objective control and evaluation. Which of the following is generally NOT validated through the WBS?
A.Time, schedule and cost.
B.Management coordination and organization structuring.
C.Work methods and accountability.
D.Quality of work.
E.Risk and impact decision-making.
169 Which quality management tool would be used to determine potential causes of a production problem?
A. control chart.
B. Ishikawa diagram.
C. scatter diagram.
D. histogram.
E. run chart
A . control chart.
B . Ishikawa diagram.
C . scatter diagram.
D . histogram.
E . run chart.
A . cause and effect diagrams.
B . flow chart.
C . control chart.
D . pareto chart.
E . trend chart.
146 The work breakdown structure (WBS) is an excellent tool for objective control and evaluation. Which of the following is generally NOT validated through the WBS?
A. Time, schedule and cost.
B. Management coordination and organization structuring.
C. Work methods and accountability.
D. Quality of work.
E. Risk and impact decision-making