题目内容 (请给出正确答案)
[主观题]

Cost and schedule data are usually integrated because:A.optimized project cash flow can af

Cost and schedule data are usually integrated because:

A.optimized project cash flow can affect financial requirements

B.they provide MIS with an integrated system to produce reports

C.they control escalation allowances

D.they account for omissions in the definitive estimate

E.they predict future performance

查看答案
答案
收藏
如果结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能还需要:
您的账号:
发送账号密码至手机
发送
安装优题宝APP,拍照搜题省时又省心!
更多“Cost and schedule data are usu…”相关的问题
第1题
The Work Breakdown Structure (WBS) is the basis for communicating:A.Project scope, cost co

The Work Breakdown Structure (WBS) is the basis for communicating:

A.Project scope, cost control, schedule, quality

B.Project objectives, dependencies, plan, cost control

C.Project scope, schedule, staffing, cost control

D.Project scope, quality, schedule, dependencies

E.Project budget, schedule, risk factors, work assignments.

点击查看答案
第2题
Project trade-offs vary betweenA.risk, cost and schedule.B.direct cost, indirect cost, and

Project trade-offs vary between

A . risk, cost and schedule.

B . direct cost, indirect cost, and resource availability

C . quality, schedule and time

D . cost, quality and schedule

E . contract terms, scope and budget

点击查看答案
第3题
A negative cost variance and positive schedule variance means:AThe project is under budget

A negative cost variance and positive schedule variance means:

A The project is under budget and ahead of schedule

B The project is over budget and behind schedule

C The project is over budget and ahead of schedule

D The project will be overrun but ahead of schedule at completion

点击查看答案
第4题
What is the relative priority of project Cost, Schedule and Quality?A.1)Cost - 2)Schedule

What is the relative priority of project Cost, Schedule and Quality?

A . 1)Cost - 2)Schedule - 3)Quality

B . 1)Quality - 2)Schedule - 3)Cost

C . 1)Quality - 2)Cost - 3)Schedule

D . 1)Schedule - 2)Quality - 3)Cost

E . All are of equal priority

点击查看答案
第5题
120The Work Breakdown Structure (WBS) is the basis for communicating: A.Project scope, cos

120 The Work Breakdown Structure (WBS) is the basis for communicating:

A. Project scope, cost control, schedule, quality

B. Project objectives, dependencies, plan, cost control

C. Project scope, schedule, staffing, cost control

D. Project scope, quality, schedule, dependencies

E. Project budget, schedule, risk factors, work assignments

点击查看答案
第6题
130What is the relative priority of project Cost, Schedule and Quality? A.1)Cost - 2)Sched

130 What is the relative priority of project Cost, Schedule and Quality?

A. 1)Cost - 2)Schedule - 3)Quality

B. 1)Quality - 2)Schedule - 3)Cost

C. 1)Quality - 2)Cost - 3)Schedule

D. 1)Schedule - 2)Quality - 3)Cost

E. All are of equal priority

点击查看答案
第7题
项目成功的衡量标准()

A.时间(time,schedule)

B.质量(quality、objective、requirements)

C.成本(cost、budget)

点击查看答案
第8题
Which method shown below is acceptable for reducing cost or shortening the schedule?A."Cra

Which method shown below is acceptable for reducing cost or shortening the schedule?

A."Crashing"

B.Changing scope.

C.Performing activities in parallel rather than in series.

D.All of the above.

E.A and C only.

点击查看答案
第9题
You have summarized the project and note that , hours have been scheduled, , hours have be
en earned and , hours paid. The correct conclusion is:

A.The project is operating at a favorable cost efficiency ratio.

B.the project is spending more than planned

C.the project is behind schedule

D.the project is ahead of schedule

E.B and C

点击查看答案
第10题
A Project Status Report would include all of the following except:ACost and schedule repor

A Project Status Report would include all of the following except:

A Cost and schedule reports

B Changes to scope. cost or schedule

C Narrative explanation of variances

D Personnel problems on the project

E Upcoming activities

点击查看答案