首页 > 建筑工程类考试> 投资项目管理
题目内容 (请给出正确答案)
[单选题]

The construction work is progressing properly.________ , the bridge across the river

A.Thankfully

B.Fortunately

C.Gradually

D.Hopefully

查看答案
答案
收藏
如果结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能还需要:
您的账号:
发送账号密码至手机
发送
安装优题宝APP,拍照搜题省时又省心!
更多“The construction work is progr…”相关的问题
第1题
What is denotation of a word().

A.Denotation is the dictionary definition of a wor

B.It is basically the literal meanin

C.It is the direct or explicit meaning of a word or phras

D.All of them.

点击查看答案
第2题
The manager would rather his daughter______in the same office.A.had not workedB.not to wor

The manager would rather his daughter______in the same office.

A.had not worked

B.not to work

C.does not work

D.did not work

点击查看答案
第3题
He felt very tired because he ______ 18 hours without a rest.A.had workedB.workedC.was wor

He felt very tired because he ______ 18 hours without a rest.

A.had worked

B.worked

C.was working

D.had been working

点击查看答案
第4题
Word文档操作中,可以用鼠标拖动的方法实现文本块的复制。此时。应该先选定Wor D.文本块,然
后()

A.按住Ctrl键并拖动鼠标

B.按住Shift键并拖动鼠标

C.按住Aft键并拖动鼠标

D.直接拖动鼠标

点击查看答案
第5题
Mr. Wright was the ______ president of Ace Construction Company.A.previousB.beforeC.latter

Mr. Wright was the ______ president of Ace Construction Company.A.previous B.beforeC.latter D.former

点击查看答案
第6题
Work ____on the construction site last April and was completed within fifty-two weeks.

A.varnished

B.commenced

C.departed

D.projected

点击查看答案
第7题
Overlapping activities on a project, such as design and construction, is referred to as:A.

Overlapping activities on a project, such as design and construction, is referred to as:

A.Fast tracking

B.Risk conversion.

C.Parallel management.

D.Process improvement.

E.Synchronous manufacturing

点击查看答案
第8题
On 1 October 20X1, Bash Co borrowed $6m for a term of one year, exclusively to finance the
construction of a new piece of production equipment. The interest rate on the loan is 6% and is payable on maturity of the loan. The construction commenced on 1 November 20X1 but no construction took place between 1 December 20X1 to 31 January 20X2 due to employees taking industrial action. The asset was available for use on 30 September 20X2 having a construction cost of $6m.

What is the carrying amount of the production equipment in Bash Co’s statement of financial position as at 30 September 20X2?

A.$5,016,000

B.$6,270,000

C.$6,330,000

D.$6,360,000

点击查看答案
第9题
12Overlapping activities on a project, such as design and construction, is referred to as:

12 Overlapping activities on a project, such as design and construction, is referred to as:

A. Fast tracking

B. Risk conversion.

C. Parallel management.

D. Process improvement.

E. Synchronous manufacturing

点击查看答案
第10题
In relation to the Property Law of China:(a) explain the term ‘right to use the land for c

In relation to the Property Law of China:

(a) explain the term ‘right to use the land for construction’; (3 marks)

(b) state the forms to establish the right to use the land for construction; (3 marks)

(c) state the various forms of disposal in relation to the right to use the land for construction by the owner of such a right. (4 marks)

点击查看答案
第11题
The construction of the laboratory______ by the end of the year.A.will completeB.will have

The construction of the laboratory______ by the end of the year.

A.will complete

B.will have completed

C.will be completed

D.will have been completed

点击查看答案
退出 登录/注册
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改