首页 > 建筑工程类考试> 监理工程师
题目内容 (请给出正确答案)
[单选题]

Work ____on the construction site last April and was completed within fifty-two weeks.

A.varnished

B.commenced

C.departed

D.projected

查看答案
答案
收藏
如果结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能还需要:
您的账号:
发送账号密码至手机
发送
安装优题宝APP,拍照搜题省时又省心!
更多“Work ____on the construction s…”相关的问题
第1题
While establishing support procedures and policies for her web server Nicole must cons

A.HTML document properties

B.Active streaming format file (ASFF)

C.URL properties

D.Multi purpose Internet mail extension

点击查看答案
第2题
The passage iS mainly about__________.A.the results of an opinion pollB.what cons

The passage iS mainly about__________.

A.the results of an opinion poll

B.what constitute the.best formula for happiness

C.the importance of wealth to happiness

D.why some people are happy and some are riot

点击查看答案
第3题
128On a precedence diagram, the arrow between two boxes is called: A.An activity. B.A cons

128 On a precedence diagram, the arrow between two boxes is called:

A. An activity.

B. A constraint. C. An event.

D. The critical path.

E. None of above

点击查看答案
第4题
We need to ________how we're going to get there.

A.work on

B.work out

C.work over

D.work at

点击查看答案
第5题
Typical characteristics of a work package include:ARepresentation of units of work at a le

Typical characteristics of a work package include:

ARepresentation of units of work at a level where work is performed

BClearly distinguishes one work package from all others assigned to a single functional group

CLimits the work to be performed to relatively short periods of time

DAll of the above

EA and B only

点击查看答案
第6题
Cleaners and farmers do ______scientists do. A. the same work as B. less important w

Cleaners and farmers do ______scientists do.

A. the same work as

B. less important work than

C. more work than

D. as important work as

点击查看答案
第7题
This kind of work is ______ me.A.unfamiliar withB.unfamiliar byC.unfamiliar toD.not unfami

This kind of work is ______ me.

A.unfamiliar with

B.unfamiliar by

C.unfamiliar to

D.not unfamiliar of

点击查看答案
第8题
The Cost Performance Index is computed as:A.budget cost of work performed divided by actua

The Cost Performance Index is computed as:

A . budget cost of work performed divided by actual cost of work performed

B . budget cost of work performed minus actual cost of work performed

C . budget cost of work performed minus budget cost of work scheduled

D . budget cost of work scheduled divided by budget cost of work performed

E . actual cost of work scheduled divided by budget cost of work performed

点击查看答案
第9题
For busy office workers, they can work out in the _____ after work or at weekend.

点击查看答案
第10题
Work packages are used to:A.Represent units of work at a level where work is performed.B.C

Work packages are used to:

A . Represent units of work at a level where work is performed.

B . Clearly distinguish one work package from all others assigned to a single functional group.

C . Limit the work to be performed to relatively short periods of time.

D . All of the above.

E . A and B only

点击查看答案
退出 登录/注册
发送账号至手机
密码将被重置
获取验证码
发送
温馨提示
该问题答案仅针对搜题卡用户开放,请点击购买搜题卡。
马上购买搜题卡
我已购买搜题卡, 登录账号 继续查看答案
重置密码
确认修改