[主观题]

The Cost Performance Index is computed as:A.budget cost of work performed divided by actua

The Cost Performance Index is computed as:

A . budget cost of work performed divided by actual cost of work performed

B . budget cost of work performed minus actual cost of work performed

C . budget cost of work performed minus budget cost of work scheduled

D . budget cost of work scheduled divided by budget cost of work performed

E . actual cost of work scheduled divided by budget cost of work performed

查看答案
答案
收藏
如果结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能还需要:
您的账号:
发送账号密码至手机
发送
安装优题宝APP,拍照搜题省时又省心!
更多“The Cost Performance Index is …”相关的问题
第1题
The most common definition of project success is:A.Within timeB.Within time and costC.With

The most common definition of project success is:

A.Within time

B.Within time and cost

C.Within time, cost and technical performance requirements

D.Within time, cost, performance and accepted by the customer/user

E.None of the above

点击查看答案
第2题
The Cost Performance Index (CPI) measures:A.cost of work performed vs planned costs.B.work

The Cost Performance Index (CPI) measures:

A.cost of work performed vs planned costs.

B.work performed vs cost of work performed.

C.work performed vs planned work.

D.direct costs vs indirect costs.

E.floating costs vs. sunk costs.

点击查看答案
第3题
Which of the following types of contracts allows the owner to transfer risk to the contrac
tor:

A cost plus incentive fee

B cost sharing

C firm fixed price

D cost plus fixed fee

E performance guarantees

点击查看答案
第4题
181The comprehensive review of a contractor's technical performance, cost performance, and

181 The comprehensive review of a contractor's technical performance, cost performance, and delivery schedule, is referred to as:

A. post project evaluation

B. post contract evaluation

C. post mortem

D. procurement performance evaluation

E. contractor's performance evaluation

点击查看答案
第5题
The Cost Performance Index (CPI) measuresA.total costsB.performance over a period of timeC

The Cost Performance Index (CPI) measures

A.total costs

B.performance over a period of time

C.costs at a point of time

D.variable costs

E.All of the above.

点击查看答案
第6题
Value engineering/Analysis is the systematic use of techniques which does not include ____
_.

A.establishing values for required functions

B.provide the required functions at the lowest overall cost.

C.identifies the required function of an item

D.seeks to trade performance for cost

E.None of the above.

点击查看答案
第7题
The comprehensive review of a contractor's technical performance, cost performance, and de
livery schedule, is referred to as:

A post project evaluation

B post contract evaluation

C post mortem

D procurement performance evaluation

E contractor's performance evaluation

点击查看答案
第8题
Project tradeoffs are usually made by comparing _____ and constraints.ATime, cost, and qua

Project tradeoffs are usually made by comparing _____ and constraints.

ATime, cost, and quality

BTime, risk, and quality

CRisk, quality, and manpower availability

DCost, quality, and technical performance

ECost, quality, and risk

点击查看答案
第9题
51Which of the following types of contracts allows the owner to transfer risk to the contr

51 Which of the following types of contracts allows the owner to transfer risk to the contractor:

A. cost plus incentive fee

B. cost sharing

C. firm fixed price

D. cost plus fixed fee

E. performance guarantees

点击查看答案
第10题
(b) The management of Division C has identified the need to achieve cost savings in order

(b) The management of Division C has identified the need to achieve cost savings in order to become more

competitive. They have decided that an analysis and investigation of quality costs into four sub-categories will

provide a focus for performance measurement and improvement.

Required:

Identify the FOUR sub-categories into which quality costs can be analysed and provide examples (which

must relate to Division C) of each of the four sub-categories of quality cost that can be investigated in order

that overall cost savings might be achieved and hence the performance improved. (8 marks)