首页 > 其他
题目内容 (请给出正确答案)
[主观题]

This overcoat cost() . What's more, they are small for me.A. very much; veryB. to

This overcoat cost() . What's more, they are small for me.

A. very much; very

B. too much; much too

C. much too; too much

D. very much; too much

查看答案
答案
收藏
如果结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能还需要:
您的账号:
发送账号密码至手机
发送
安装优题宝APP,拍照搜题省时又省心!
更多“This overcoat cost() . What's …”相关的问题
第1题
Lane waited on the bench nearest the bridge, as he had been instructed. The wind blew stra
ight across the river, sharp as a razor, and he had to pull his overcoat closer about him.

He went over his instructions in his mind. The agent would appear at four o' clock. He would chat to Lane for a while, after which he would get up, leaving his newspaper behind. The plan would be fastened inside.

A distant clock began to strike the hour. As if from nowhere, a man appeared and sat down be side Lane, placing his newspaper on the seat between them. He was thin and middle-aged, and seemed in need of a good meat. He bored no resemblance to Lane' s idea of a successful spy. His conversation, confined to trivial observations about the weather, was painfully uninteresting.

A few minutes later he got up and continued on his way. Large picked up the paper which laid on the bench, as if he wanted to look at the news. He was excited to see the plans pinned to the center page. At that moment, however, there was a strong wind which lifted the newspaper into the air, like a kite, and blew it into the river.

Lane ______.

A.memorized his orders

B.recited his orders

C.tried to remember his orders

D.repeated his orders himself

点击查看答案
第2题
Costs that change as output changes: ().

A.fixed cost

B.variable cost

C.sunk cost

D.overhead cost

点击查看答案
第3题
Cost of quality includes:A.Appraisal costB.detection costC.prevention costD.maintenance co

Cost of quality includes:

A . Appraisal cost

B . detection cost

C . prevention cost

D . maintenance cost

E . A, B, and C only

点击查看答案
第4题
Cost management includes:A.Cost estimating/forecasting.B.Cost budgeting/cost control.C.Cos

Cost management includes:

A . Cost estimating/forecasting.

B . Cost budgeting/cost control.

C . Cost applications.

D . All of the above.

E . A and B only.

点击查看答案
第5题
Using the cumulative cost curve in the special window, height B representsA.actual cost to

Using the cumulative cost curve in the special window, height B represents

A.actual cost to date

B.total budgeted costs for the project

C.planned cost for month

D.cost variance

E.earned value

点击查看答案
第6题
98Cost management includes: A.Cost estimating/forecasting. B.Cost budgeting/cost control.

98 Cost management includes:

A. Cost estimating/forecasting.

B. Cost budgeting/cost control.

C. Cost applications.

D. All of the above.

E. A and B only

点击查看答案
第7题
The direct labour cost per unit has been based on an expected learning rate of 90% but now
the finance director has realised that a 95% learning rate should be applied.

Which of the following statements is true?

A.The target cost will decrease and the cost gap will increase

B.The target cost will increase and the cost gap will decrease

C.The target cost will remain the same and the cost gap will increase

D.The target cost will remain the same and the cost gap will decrease

点击查看答案
第8题
Reusing frequencies in a cellular pattern (compared to “one big cell”):()

A.Increases channel utilization, cost ,and interference

B.Increases capacity and cost, but decreases interference

C.Increases capacity, but decreases cost and interference

D.Increases capacity, cost, and interference

E.Increases channel utilization and cost, but decreases interference

点击查看答案
第9题
A. spendB. cost C. pay D. take

A.spend

B. cost

C. pay

D. take

点击查看答案
第10题
What is the relative priority of project Cost, Schedule and Quality?A.1)Cost - 2)Schedule

What is the relative priority of project Cost, Schedule and Quality?

A . 1)Cost - 2)Schedule - 3)Quality

B . 1)Quality - 2)Schedule - 3)Cost

C . 1)Quality - 2)Cost - 3)Schedule

D . 1)Schedule - 2)Quality - 3)Cost

E . All are of equal priority

点击查看答案
第11题
The estimated cost to complete (ETC) is _____.A.BCWP/ACWPB.the forecasted and final cost -

The estimated cost to complete (ETC) is _____.

A.BCWP/ACWP

B.the forecasted and final cost - cost to date

C.(ACWP-BCWP)/BCWP *

D.Total estimate - ACWP

E.None of the above.

点击查看答案