题目内容 (请给出正确答案)
[主观题]

77Since risk is associated with most projects, the best course of action is to: A.cover al

77 Since risk is associated with most projects, the best course of action is to:

A. cover all project risks by buying appropriate insurance

B. ignore the risks, since nothing can be done about them and move forward with the project in an expeditious manner.

C. avoid projects with clear and present risks

D. eliminate all known risks prior to the execution phase of the project

E. identify various risks and implement actions to mitigate their potential impact

查看答案
答案
收藏
如果结果不匹配,请 联系老师 获取答案
您可能会需要:
您的账号:,可能还需要:
您的账号:
发送账号密码至手机
发送
安装优题宝APP,拍照搜题省时又省心!
更多“77Since risk is associated wit…”相关的问题
第1题
Why do men ________ enjoying themselves with getting drunken?A. conveyB. fulfillC. asso

Why do men ________ enjoying themselves with getting drunken?

A. convey

B. fulfill

C. associate

D. postponing

点击查看答案
第2题
Screening of risk events for potential risk is known as _____ .Aproblem structuring.Brisk

Screening of risk events for potential risk is known as _____ .

A problem structuring.

B risk identification

C risk quantification

D risk modeling

E risk mitigation

点击查看答案
第3题
冒险做某事怎么表达()

A.risk doing sth

B.risk to do sth

C.risk do sth

点击查看答案
第4题
Country risk refers to political risk existing in a country.A.RightB.WrongC.Doesn't say

Country risk refers to political risk existing in a country.

A.Right

B.Wrong

C.Doesn't say

点击查看答案
第5题
(b) (i) Discuss the relationship between the concepts of ‘business risk’ and ‘financial st

(b) (i) Discuss the relationship between the concepts of ‘business risk’ and ‘financial statement risk’; and

(4 marks)

点击查看答案
第6题
(c) Define ‘market risk’ for Mr Allejandra and explain why Gluck and Goodman’s market risk

(c) Define ‘market risk’ for Mr Allejandra and explain why Gluck and Goodman’s market risk exposure is

increased by failing to have an effective audit committee. (5 marks)

点击查看答案
第7题
The risk of accepting a lot of poor quality, in acceptance sampling, is referred to as:A.b

The risk of accepting a lot of poor quality, in acceptance sampling, is referred to as:

A . buyer's risk

B . consumer's risk

C . producer's risk

D . type I error

E . B and D only

点击查看答案
第8题
125In Project Risk Management, Risk Response may include actions to: A.reduce the probabil

125 In Project Risk Management, Risk Response may include actions to:

A. reduce the probability of risk events

B. change the scope, budget, schedule or quality specifications of the project

C. reduce the consequences or severity of impacts of a potential risk event

D. A and C

E. All of the above

点击查看答案
第9题
Total project risk can be defined as:Athe sum of the probabilities of project risks events

Total project risk can be defined as:

A the sum of the probabilities of project risks events times the sum of consequences of those risks

B the sum of the products of each project risk event times its consequences

C the sum of the consequences of all project risk events

D the sum of the probabilities of all project risk events

E 1 - the sum of the probabilities of all project risk events.

点击查看答案
第10题
In Project Risk Management, Risk Response may include actions to:Areduce the probability o

In Project Risk Management, Risk Response may include actions to:

A reduce the probability of risk events

B change the scope, budget, schedule or quality specifications of the project

C reduce the consequences or severity of impacts of a potential risk event

D A and C

E All of the above.

点击查看答案